01 / 01

Roadway outdoor lighting works

Execution and completion of Lighting of Zestaphoni-Kutaisi-Samtredia highway (E-60) New Samtredia Bypass Road on the section between KP0+000 – KP15+400; km0+000 – km17+300; Km15+400 – Km24+045; km 0+000 - km 15+172; by the order of the Roads Department of the Ministry of Regional Development and Infrastructure of Georgia, within the frame of the East-West Highway Improvement Project and through financial aid from the Japan International Cooperation Agency (JICA).

Tbilisi-Senaki-Leselidze

Provision of Roadway lighting works at road interchanges located along the Tbilisi-Senaki-Leselidze (S1)(border of Russian Federation) international road km19-km84 and Bridge crossings(approximate length 28,65 ), by the order of The Roads Department of Georgia.

Zestaphoni-Kutaisi-Samtredia highway (E60)

Project implementation date: 01.2017 - 09.2017

Kobuleti Bypass Road (km 12+400 ~ km 31+259)

Outdoor lighting works at km 12+400-km31+259 (design road section km0+000-km17+964, LOT 2) of secondary Kobuleti bypass road, by the order of the Roads Department of Georgia, Sinohydro Corporation Limited. The project was implemented within the frame of the Road Corridor Investment Program, through financial aid from the Asian Development Fund (ADB). Project implementation date: 05.2019 – 12.2019

Kobuleti Bypass Road Lighting (Km 0+000 – km 12+400)

Outdoor lighting works at km Km 0+000 – km 12+400 Kobuleti bypass road. Project implementation date: 08.2018 – 04.2019

© Java LTD 2016. All Rights Reserved.